This layout will have a 2nd level added 12 inches below the original. To link the two layers, I considered a helix but decided on a long slope instead.
Slope begins here. Around 2%.
Always wanted an operator access point at left wall on Layout 2. Made one for Layout 3
Lower Level: Reverse loop and yard.
Upper level with reverse loop.
Not happy with the two track runs on top of each other at left - and need some under-mount lighting for the lower level.
Under-mount lighting. Variable intensity Led's controlled with small handheld remote. Nifty.
Relocated upper track route. The background from Layout 2 is not going to work here....
Acrylics on Cardboard. Not the most ideal surface. So what...
Good enough for now. Next, redo the bridge on right.
Bridge removed to get access. Plaster Cloth and Scultptmode modeling begins.
Upper level
Track layout. Upper and Lower levels.
Interesting project. But, once again - time to move on. So long layout #3.